Mission Critical Power for Emergency ResponseThe Tallahassee public safety complex runs cat® power systems.

Mission Critical Power for Emergency Response

Leon County and the City of Tallahassee needed backup power for their new 90,000 sq-ft Public Safety Complex. Working with their local Cat dealer and building managers, they developed a system that is reliable, fuel efficient, and accepts 100% rated block load, so no call is ever dropped – even with a loss of power.

Read the whole story
Electric power products

“Caterpillar has set the standard for reliability. We’ve had no disruptions in service; that’s 100% performance.“ – Carl Morgan, facilities and construction manager for Leon County. See what Caterpillar can do for you.

Download your electric power rating guide
The n+1 backup power system includes three cat diesel generator sets and paralleling switchgear, all designed for redundancy and reliability.
Benchmark for excellence

“The installation has functioned flawlessly, and we’re humbled to see so much recognition from the industry and community alike,” said Morgan.

Watch Video
Benchmark for excellence

Cat dealer Ring Power was selected to develop the system. “Mike and the Ring team exceeded our specific power needs, and also met the regulatory and environmental requirements,” explained Morgan. Without their understanding and commitment, the solution would not have been achievable.”

Find a dealer near you
Precision sizing at your fingertips.
Precision sizing at your fingertips.

Caterpillar Electric Power is excited to introduce you to our latest generator set sizing software, Cat Electric Power Specsizer.

Try specsizer now